Conveyor Technical Guides & Project Planning Resources
Updated: 12 hours ago
CCL Engineering Answers: choose the right conveyor
Compare continuous belt, plastic modular belt and powered roller conveyors by product support, transfers, cleaning and accumulation. Includes situations where each choice needs reconsideration and the evidence to request before ordering.
CCL product catalogue: compare CCL150, CCL400 and CCL1000
Compare all three belt conveyor ranges in one place, including total uniformly distributed loads of up to 150 kg, 400 kg and 1,000 kg. Individual item weights, concentrated loads and inclines need an application review.
Use these CCL engineering guides to choose a conveyor, prepare your project brief and compare quotations. The resources bring together product selection, budgeting, installation planning and examples of completed systems from our Loughborough team.
Systems integration: connect conveyors, controls and machinery
Planning a connected production or packing line? Define the machine interfaces, PLC controls, accumulation capacity and commissioning responsibilities alongside the conveyor layout.
Find the right starting point for your conveyor project
Connecting several machines or work areas? Start with the complete route, peak flow and interfaces. Explore complete conveyor systems.
Moving cartons or totes with firm, flat bases? Compare manual movement, powered transport and controlled accumulation. Compare roller conveyor systems.
Handling pallets or heavier loads? Record the pallet underside, orientation, load distribution and transfer direction. Explore pallet and chain driven roller conveyors.
Changing level? Share the vertical rise, available horizontal run, product stability and loading heights. Explore incline and swan neck conveyors.
Using the space above your floor? Consider carriers, the support structure, access and the required route. Explore overhead conveyor systems.
Planning regular cleaning? Specify the product-contact surfaces, cleaning method, temperature and access requirements. Explore stainless steel conveyor options.
Sending products to different destinations? Identify product sizes, peak arrivals, scanning requirements and exception handling. Explore conveyor sortation systems.
Updating machine operation? Record the existing PLC and HMI, machine signals, drawings and required operating sequence. Discuss control panels, Siemens PLC programming and integration.
Unsure which option fits? A product photograph and rough layout are enough to begin the discussion. Send your handling requirements to CCL.
Choose a conveyor around the product
Start with the smallest and largest items, their weight and underside. A continuous belt can support products that would be unsuitable for rollers. Cartons and totes with suitable flat bases may suit roller transport. Pallet handling needs a separate review of runners, orientation, loading and transfer direction. The route, cleaning requirements and required flow then help define the specification.
Match conveyor capacity to the load on the belt
Compare CCL150, CCL400 and CCL1000 using the maximum total load carried at the same time: up to 150 kg, 400 kg and 1,000 kg total uniformly distributed load respectively. An evenly spread load is different from one heavy item concentrated on a small footprint. Confirm maximum individual item weight, contact area and load distribution with CCL before choosing a range.
Include the loading pattern when the next machine stops. A conveyor carrying only a few items in normal operation may hold more during a queue or restart. Tell us whether it must start fully loaded, how often it starts and stops, and whether the route inclines. Capacity alone does not confirm suitability for the required speed, belt or duty.
Plan belt speed and complete conveyor systems
Specify normal and peak items per minute, product length in the direction of travel and the required gap. These determine the starting point for belt speed; transfers, machine cycles and stopping points determine how the complete line performs.
Prepare a useful engineering brief
Record minimum and maximum product dimensions, individual and total loads, normal and peak throughput, transfer heights and the available footprint. Include a layout sketch and photographs of the product underside and existing machinery. Explain where items must stop, queue, be inspected or transfer to another machine. If a measurement is unknown, flag it for discussion rather than guessing.
Prepare your brief with Plan My Automation
Use CCL’s free planner to describe your handling challenge, record your product and process details, and download a starting brief. You can explore a business case using your own assumptions without registering. Unknown measurements can stay blank for engineering review.
Plan assembly flow and ongoing parts support
See how an engine assembly conveyor coordinates workstations and empty-jig return, and find the components information needed for a spare-parts enquiry.
Plan the equipment and installation budget
Compare quotations against the same scope. Separate conveyor equipment, controls, delivery, unloading, installation and commissioning. A standard horizontal belt conveyor calculator is useful for an initial equipment budget; a bespoke line needs a review of the full route and machine interfaces.
Separate equipment cost, capacity and cash savings
For a business case, include the full installed scope and additional annual running costs. Record staff time released separately from actual avoided spending: redeploying people can create useful capacity without reducing payroll. If you include extra output, use the additional contribution after variable costs rather than sales revenue, and avoid counting the same labour benefit twice.
The planner can compare different time-saving assumptions, but its results are not a quotation or guaranteed performance. Confirm the proposed process, investment and achievable benefits with CCL before committing to a project.
See how CCL approaches demanding installations
Morningside, Loughborough: a fully enclosed powered roller conveyor bridge handles 1,500 kg pallet loads across an approximately 10-metre span without intermediate external support stands. The project included engineering calculations, the control system and mechanical installation.
North West England: a fully enclosed twin-tier conveyor bridge with lift transfers connects buildings approximately 40 metres apart across uneven ground. The engineering addressed structural load sharing, movement, alignment and transfer interfaces.
These dimensions and capacities describe the individual installations. Each new project is specified around its own loads, structure, operating conditions and transfer requirements.
Agree conveyor trials and acceptance checks
Define representative products, measured output, test duration, machine interfaces and outstanding actions before delivery. Use the copyable acceptance brief to start the discussion.
Bring mechanics, controls and site work together
A conveyor is one part of the material flow. Agree how adjacent machines exchange signals, what happens when the next process stops, where products accumulate and how operators access the equipment. Include the required drawings, acceptance checks, installation responsibilities, handover documents and maintenance access in the project brief.
Prepare a pallet-handling project
Record pallet construction, loaded weight, peak movements, transfer heights, buffer requirements and machine interfaces. Use the copyable brief to compare manual handling with a proposed automated arrangement.
Discuss your application with CCL
Send your layout, product details and target output to our Loughborough team using the enquiry form. You can attach drawings, layouts or photographs. You do not need a finished specification to start: we can help identify the measurements and engineering decisions needed for a quotation.
Compare conveyor manufacturers and project scope
Check who designs, manufactures, programs and installs the equipment. Use a consistent checklist for testing, handover and aftercare so each quotation covers the responsibilities your project needs.
Plan an upgrade to an existing conveyor
Record the current problem, identify equipment to assess for retention, and define controls interfaces, installation time and acceptance checks before agreeing the retrofit scope.
Plan conveyor servicing and spare parts
Keep the machine reference, service history and component details together. Use the service-request checklist to explain a fault or prepare a maintenance and spares enquiry.