Choosing a conveyor system means planning the complete movement of products through your operation. The brief should explain what arrives, where it must go, how quickly it must move and what should happen when another part of the line stops.


CCL designs and manufactures bespoke conveyor systems in the UK. Our Loughborough team can discuss the layout, mechanical equipment, controls and installation as one project.



1. Define products, throughput and operating patterns


Provide the smallest and largest products, maximum item weight and photographs or samples. Explain how products arrive, whether they need to maintain orientation, and whether the conveyor handles loose material, individual packs, totes or pallets.


State the normal and peak throughput in suitable units, such as items per minute or tonnes per hour. Include batch sizes, operating hours and changes between products. Ask the supplier to explain the assumptions behind the proposed capacity, including product spacing and the performance of connected machines.


2. Plan the layout, transfers and accumulation


Send a floor plan with loading and discharge points, working heights, columns, doorways and existing equipment. Include operator routes and the access needed for cleaning and maintenance.


Identify each transfer between conveyors or machines. Discuss the smallest product that must cross it and any change in height or direction. State whether products may queue, where they can wait and what should happen when the next machine is unavailable.


3. Select the conveyor types around the application


Belt conveyors and plastic modular belt conveyors offer different carrying surfaces and construction options. Product support, transfers and cleaning requirements should guide the choice.


Explore roller conveyor systems and chain conveyors where these arrangements suit the load. Ask CCL to assess the product base, load distribution and required handling sequence before agreeing a specification.


For specialist environments, review our stainless steel conveyors and waste and recycling conveyor systems. State temperatures, cleaning methods and material characteristics in the enquiry.


4. Agree controls and machine interfaces


List the equipment feeding and receiving products, and identify who is responsible for each interface. Describe start and stop sequences, full or empty conditions, rejected products, operator controls and any production information needed.


Discuss control panels and the conveyor control sequence alongside the mechanical layout. Safety functions and access arrangements need an application-specific assessment; they should be included in the agreed project scope.


5. Compare the complete project cost


Ask quotations to separate equipment, controls, delivery, installation and commissioning where applicable. Confirm responsibility for site preparation, power supplies, connections to existing machines, training and documentation.


Discuss maintenance access, recommended spares and support arrangements. A clear scope helps you compare quotations and identify work that would otherwise be left for your team or another contractor.


6. Define how the system will be tested and handed over


Before placing the order, agree the products and operating conditions to be used for testing, the required output and how it will be measured. Define the handling sequence, interfaces to be demonstrated and any site acceptance checks. Confirm the installation window and who will be available for commissioning.


Use a standard conveyor price as a starting point

For a straightforward horizontal conveyor, use the CCL belt conveyor price calculator to explore a budget before requesting a quotation. Confirm the product load, belt dimensions and working height with our team. A standard conveyor estimate is not a price for a complete installed line: inclines, specialist belts, transfers, integrated controls and site work need their own assessment.

Learn from completed conveyor installations

At Bristol Maid, a bidirectional mezzanine conveyor linked production areas across a 3.5-metre height change. The layout had to work with existing doorway access. When planning a similar system, provide floor levels, opening dimensions and the direction of product travel.

The Elkem Solar material-handling project combined weighing belt conveyors, a 10-metre bucket elevator and vibratory conveyors. It illustrates why the whole route matters: different stages of one process can require different conveying methods.

Use these projects to explain the handling challenge you want to solve. Capacity, materials and controls should be specified for your own products and operating conditions.

Prepare your conveyor system enquiry


  • Product sizes, weights, photographs and any samples available.

  • Normal and peak throughput, operating hours and product changeovers.

  • Layout, working heights, transfer points and access restrictions.

  • Cleaning conditions, temperatures and any direct food-contact requirements.

  • Existing machines, control interfaces and required operator functions.

  • Project scope, proposed installation timing and acceptance criteria.


Use our conveyor system quotation checklist to organise your brief. You can also view completed CCL projects and read customer feedback before discussing your requirements.


 
 
 