top of page

Efficient Barrel Handling System: CCL, UK Conveyor Manufacturers, Revolutionise Breweries

May 10, 2023
2 min read

Updated: 1d

CCL designs brewery handling equipment around the containers, process and available layout. The video in this article shows a barrel-handling example; the specification for a new project must be agreed around its own operating requirements.






Automated transfers can reduce particular manual handling tasks. The benefit depends on the loading, unloading and intervention work that remains, so these activities should be assessed together with the machinery.


Start with the container route: where empty or filled containers enter, which process steps they pass through and where they leave. Record transfer heights, orientation, accumulation needs and access around the equipment.


Provide drawings or samples for every container format, including capacity, overall dimensions, weight, contact surfaces and condition. The 30-, 50- and 100-litre formats discussed in the original article are not a universal compatibility specification; tooling, supports and changeovers need confirmation.


Agree whether containers are moved individually or in groups, and identify any interfaces with palletising, filling, capping or wrapping equipment. Each operation, supplier responsibility and required output should be included in the scope.


Machinery hazards remain when handling is automated. The application needs suitable guarding, emergency stops, isolation and safe arrangements for cleaning, clearing blockages and maintenance. Automation alone does not eliminate injury risk.


The original article described a rate of up to 120 50-litre barrels per hour for the featured system. Treat this as a project-specific historical figure, not a guaranteed rate for another installation. Confirm container formats, operating sequence, operator involvement and acceptance-test conditions for any new quotation.


For a brewery project, send the container details, required output, layout and existing machinery interfaces. Include cleaning requirements, operating hours and the available installation window so the mechanical and controls scope can be reviewed.


If you are planning a brewery handling project, contact CCL with the details available. A sketch and photographs can help start the discussion.

Recent Posts

See All

Comments


bottom of page